BOOKING SERVICES FOR 2026

Great For

Restaurants & Cafés
Bars & Lounges
Retail Storefronts
Hotels & Hospitality
Medical & Professional Offices
Restaurants & Cafés
Bars & Lounges
Retail Storefronts
Hotels & Hospitality
Medical & Professional Offices

Restaurant Vestibules

Form and Function

A vestibule creates a buffer zone between the street and your interior — a transitional space that prevents cold air from rushing in every time a guest enters or exits.

Designed for Your Storefront, Not Against It

We design and fabricate custom vestibules built to the specific dimensions, proportions, and aesthetic of your storefront — aluminum framing, Sunbrella fabric, clear panels, integrated signage.

Integrated Signage and Branding

Etched or frosted vinyl on panels, illuminated signage in the header, dimensional letters on the frame. Done well, the vestibule becomes one of the most visible brand touchpoints on your facade.

 

Seasonal and Permanent Installations

We build for both — permanent vestibules engineered for long-term exterior exposure, seasonal systems designed for clean installation and removal.

Restaurant Vestibules FAQs

Yes — and it should be. We design every vestibule to the specific dimensions and aesthetic of the storefront it serves. If you have existing aluminum framing, awning hardware, or architectural details, we’ll design to complement them.

They’re built to the same fabrication standard — the difference is in how they’re anchored and detailed for removal. Seasonal vestibules use mounting systems designed for clean seasonal installation and takedown, but they’re not flimsy or temporary-looking. When they’re up, they look and feel permanent.

Yes. When the season turns and it’s time to come down, we can remove your vestibule, break it down, and store it at our facility until it’s needed again the following fall. It goes back up the same way it came down — clean, efficient, and without the hassle of finding somewhere to put it yourself.

From approved design through installation, most vestibule projects run 6 to 10 weeks, with permitting being the variable that most affects timeline. We’ll give you a realistic schedule at the outset based on your specific location and the permitting requirements that apply.

Discover More Signage Products

Browse All Products
Got questions? Get in touch